Joint Booster Pump Station No. 3 (JB3) Project

Saturday, March 3 | 1:30 - 5:00 p.m.

Joint Booster Pump Station No. 3 tour - CI Summit

This site tour consists of six different construction contracts equaling a total cost of approximately $70 million.

The components include construction of two 40 million gallon soil cement lined earthen berm suction reservoirs, a 69kV high voltage substation, a 29,290 SF pump station, and three different owner furnished equipment packages for large diameter gate valves, large diameter butterfly valves, and pumps, motors, and drives.